The Department of Defense commissioned this pilot of Sierra Energy’s FastOx Gasifier technology at Fort Hunter Liggett. This modular system has the capacity to produce 10 tons of liquid fuel per day through a gasification system that uses waste. Egan fabricated modules for pre-processing, gasification, gas cleaning, utilities and controls.

Built in Grand Rapids, MI and shipped to Fort Hunter Liggett in California for installation