In November 2017, Foremost Farms announced plans to build a dairy processing facility across a 96-acre site in Greenville, Mich. This project had a fast-paced construction schedule, which required significant fabrication in Egan's shop. The entire project duration was just five months, which included modeling, fabrication, installation and startup. Egan's scope included HVAC, plumbing and mechanical.
Next project
Frauenthal Theater Renovation
Related work
More in Pharmaceutical.
01
Amway Spaulding Nutrilite
Amway
2014
02
Sterilizer System
Dairy Producer
2017

03
GRAM Expansion
Grand River Aseptic Manufacturing
2020

04
GRAM Expansion Phase III
Grand River Aseptic Manufacturing
2025
05
GRAM Expansion Phase II
Grand River Aseptic Manufacturing
2022
06
Kraft Heinz Grey Poupon
Kraft Heinz
2017

07
Spaulding Nutrilite Tableting Expansion
Amway
2022
08
Holland Production Facility
Perrigo

Start a project
Let's build it right.
When quality counts, Egan is the industry-leading, single-source mechanical contractor with the experience, technology and capacity for projects with the most rigorous construction standards.
24/7 Emergency Service · 1-800-594-9244